{"id":108,"date":"2026-10-21T10:00:00","date_gmt":"2026-10-21T10:00:00","guid":{"rendered":"https:\/\/www.911maison.ca\/blog\/?p=108"},"modified":"2026-10-21T10:00:00","modified_gmt":"2026-10-21T10:00:00","slug":"canadian-data-centres-reshape-construction-insurance-liana-michina-lianamichina-com","status":"publish","type":"post","link":"https:\/\/www.911maison.ca\/blog\/2026\/10\/21\/canadian-data-centres-reshape-construction-insurance-liana-michina-lianamichina-com\/","title":{"rendered":"Canadian Data Centres Reshape Construction Insurance | Liana Michina LianaMichina.com"},"content":{"rendered":"<div class=\"video-zmyer\">\n<div class=\"video-frame-zmyer\">\n        <iframe loading=\"lazy\" width=\"640\" height=\"640\" src=\"https:\/\/www.roomvu.com\/agent\/embed\/liana-michina\/data-centres-insurance-remotion-videos-164e\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture\" allowfullscreen><br \/>\n        <\/iframe>\n    <\/div>\n<div class=\"video-description-zmyer\">\n<p>By 2031, Canada data centre construction is projected to reach $8.6B, with individual projects often topping $5B-$15B and testing lenders and insurers.<br \/>\nAt this scale, standard builder&#039;s risk placement no longer fits. Carrier engagement must start earlier, backed by stronger technical presentations and engineered program structures.<br \/>\nCapacity exists, but success depends on clear visibility, maximum-loss studies, and presenting layered risk coherently to both domestic and international carriers simultaneously.<br \/>\nCanada is still early in captive adoption, yet brokers in this space need fluency with retention strategies before major tech firms bring them.<br \/>\nLabor strain can lift quality risks, while clean handoff from construction to operational coverage will define program quality after financial close in Canada.<\/p>\n<\/p><\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>By 2031, Canada data centre construction is projected to reach $8.6B, with individual projects often topping $5B-$15B and testing lenders and insurers. At this scale, standard builder&#039;s risk placement no longer fits. Carrier engagement must start earlier, backed by stronger technical presentations and engineered program structures. Capacity exists, but success depends on clear visibility, maximum-loss [&hellip;]<\/p>\n","protected":false},"author":10,"featured_media":109,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-108","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-latest-posts"],"_links":{"self":[{"href":"https:\/\/www.911maison.ca\/blog\/wp-json\/wp\/v2\/posts\/108","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.911maison.ca\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.911maison.ca\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.911maison.ca\/blog\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/www.911maison.ca\/blog\/wp-json\/wp\/v2\/comments?post=108"}],"version-history":[{"count":1,"href":"https:\/\/www.911maison.ca\/blog\/wp-json\/wp\/v2\/posts\/108\/revisions"}],"predecessor-version":[{"id":110,"href":"https:\/\/www.911maison.ca\/blog\/wp-json\/wp\/v2\/posts\/108\/revisions\/110"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.911maison.ca\/blog\/wp-json\/wp\/v2\/media\/109"}],"wp:attachment":[{"href":"https:\/\/www.911maison.ca\/blog\/wp-json\/wp\/v2\/media?parent=108"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.911maison.ca\/blog\/wp-json\/wp\/v2\/categories?post=108"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.911maison.ca\/blog\/wp-json\/wp\/v2\/tags?post=108"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}